RISING MAIN FOR ROTHDENE PUMP STATION IN MEYERTON

We were appointed to undertake the Environmental Authorisation and Water Use Authorisation Processes for the  construction of a bulk sewer rising main between the existing Rothdene Sewage Pump Station and the existing Meyerton Waste Water Treatment Works (WWTW) in Meyerton, Gauteng.

Details of the new rising main are:

  • The pipeline will be approximately 4.68km in length;
  • The pipeline will have a diameter not exceeding 900mm.
  • The maximum throughput of the rising main will be approximately 740 ℓ/s.