LESOTHO LOWLANDS BULK WATER SUPPLY SCHEME GEOTECHNICAL INVESTIGATION

JG Afrika was appointed to undertake the geotechnical investigation for the construction of about 600 km of new bulk water supply pipeline, as well as 22 reservoirs and wastewater treatment works for the Lesotho Lowlands Bulk Water Supply Scheme.

Trial pitting was undertaken along the entire length of the proposed pipeline route, in addition to assessing the founding conditions and excavation classes, in addition to producing geological long sections and interpretive reports.