We were responsible for the full scope of services for the Northern wastewater treatment works (NWTW), including preliminary and detailed design, documentation, contract administration and site supervision.
Three 8 m diameter reinforced concrete vortex degritters with an average dry weather flow capacity of 150 Ml/d were installed at Unit 3 to replace three gravity settling units.
The project also included the stainless steel airlift pipework and a unique fluidisation process using two pumps to pump screened raw effluent.